Model questions for
Loksewa Civil Irrigation engineer
2nd class
1. Due to
the flood fall in the Mahakali River in 2017, Darchula's office was damaged and
huge damage was made. Nepal is as the river Mahakali river what kind of
structure should you have to control the land? Design the concept. 15
2. Describe
briefly the National policies developed in irrigation sector? Are they
effectively followed in our irrigation sector? What are your views for its
effective implementation? (8+7)=15
3. Canal
lining what is the situation? Describe the type of evolution. Regarding the
development of the canals in the hilly irrigation project, it is mentioned
about the subjects to focus on Do it. (5+5+5)=15
4.
Provide
an overview of ground water potential in Nepal. Explain different well
construction and well development methods for tubewells made for irrigation in
the Terai region of Nepal. (6+9)=15
5.
Explain
the leakage of water due to the water to the irrigated area of the canal of
the canal. What irrigation techniques and systems are needed to reduce the
leakage in the field. Suggest existing technologies for the improvement in the
construction techniques and process necessary (4+5+6+5)=20
6.
Which
big projects made by the Government in Nepal have been transferred to the
Consumer Committee? What is the condition of the maintenance of the transfers
of the projects? What system does it make to be effective to make it effective?
Think about it. (4+4+6+6)=20
~ The End ~
No comments:
Post a Comment